Arctrack

One live profit number for every construction project.

Live on Google Play

Arctrack is a mobile app for the engineers and contractors who run construction money. It turns claims, costs and retention into one profit number for each project, shown beside the cash position, on the phone and even offline.

Features

Contract set-up

Create the project once: load the bill of quantities and set the retention, advance payment and payment terms.

  • Lump sum, unit rate, cost-plus, and time and material contracts

Claims and retention (المستخلصات والمحتجزات)

Build each claim from measured work, beside the cumulative total, and send it as a bilingual Arabic and English PDF on WhatsApp. Retention and advance recovery are calculated on every claim and released on schedule.

  • This claim beside the cumulative
  • Bilingual PDF, shared on WhatsApp
  • Retention released when the defects period ends

Offline-first on site

Record expenses, measured quantities, photos and documents with no signal. Entries wait in a queue and sync when the phone is back online.

AI receipt scan and voice entry

Scan a receipt or a bank-transfer screenshot, or say the entry in Arabic or English. Arctrack fills in the amount, vendor and category as a suggestion, and a person confirms it before it is saved.

  • AI suggests. You confirm. Nothing posts itself.

QR-verified documents

Receipts and claim packs that Arctrack generates carry a QR code. Anyone can scan it with a phone camera to check the document against Arctrack's record, without installing the app.

Profit and cash, side by side

Billed profit is the revenue from the claims you have billed minus the costs you have incurred. Arctrack shows it beside the cash position and never mixes the two.

  • Export ledgers, claims and profit and loss to Excel

Inside the product

Every project's profit on one screen.
Dashboard
Al Nakheel Villas
Synced
Billed profit · YTD18.4%
SAR 412,800
Billed claim revenue − costs incurred
Cash position
SAR 96,200
In − out, all projects
Retention held
SAR 58,400
Across 3 projects
By project · margin
Al Nakheel Villas28.3%
Al Rawda warehouse14.8%
Clinic fit-out19.6%
Home
Claims
Scan
Sync
  1. One live profit number for each project
  2. Active projects and where each one stands
  3. Works with or without signal
A client claim, built from the bill of quantities.
Claim #12 · Al Nakheel Villas
Al Rawda · sent 14 May
This claim
SAR 84,300
Net of retention
vs
Cumulative
SAR 312,900
Claims #1–12
Bill of quantities · this period
Excavation & backfill38,400
100%
Concrete works31,650
72%
Blockwork & plaster18,687
40%
Work doneSAR 88,737
Retention held 5%SAR −4,437
DueSAR 84,300
Share PDF on WhatsApp
  1. Measured work from the bill of quantities
  2. Retention held on this claim
  3. Sent as a bilingual PDF
AI reads the receipt. A person confirms.
AI scan
Receipt or voice note
Synced
Al Nour Steel
TotalSAR 1,240
AI read this receipt
Read from the receipt
SupplierAl Nour Steel
ProjectAl Nakheel Villas
CategoryMaterials · Steel
Voice entry
“Paid the driver 150 for delivery”
Confirm
Nothing is saved until you confirm.
Home
Claims
Scan
Sync
  1. Amount and vendor read from the photo
  2. Or say it: voice entry in Arabic or English
  3. Nothing is saved until you confirm
Saved on site, synced later.
Sync queue
Offline · 5 items waiting
You're offline
Work is saved on the phone and will sync by itself when the signal returns.
Waiting to sync · 5
Claim #12 · Al Nakheel Villas
Today · 11:42
SAR 84,300
14 site photos
Al Nakheel Villas
Petty cash · 8 entries
Today
SAR −320
Defect · roof leak
Villa 7 · 11:08
Receipt · Al Nour Steel
Awaiting confirm
SAR 1,240
Synced this session · 3Synced
Receipt sent to client
09:18
Claim #11 approved
09:14
22 photos backed up
08:42
Home
Claims
Scan
Sync
  1. Entries saved offline, waiting for signal
  2. The sync status of each entry
The project's profit and loss.
Al Nakheel Villas · P&L
April 2026
Synced
IncomeSAR 478,000
CostsSAR −342,600
Net profitSAR 135,400Margin 28.3%
By phase
01Excavationdone
98%
78,400 / SAR 80,000
02Foundationdone
99%
138,900 / SAR 140,000
03Structure · L1–4active
38%
84,200 / SAR 220,000
04MEP rough-inactive
37%
41,100 / SAR 110,000
  1. Billed income from claims
  2. Costs incurred
  3. The project's margin

Plans

  • Starter

    Freeno charge

    • 1 active project
    • Basic receipts
    • Single currency
  • Professional

    SAR 81.99per month

    • or SAR 729.99 a year
    • Unlimited projects
    • Multi-currency
    • Documents and attachments
    • AI receipt scan and voice entry
    • Team members
  • Agency

    SAR 209.99per month

    • or SAR 1,899.99 a year
    • Everything in Professional
    • Client access to a read-only project portal

Subscriptions are billed through Google Play.

Arctrack

One live profit number for every construction project.